As we all know, oil and gas are non-renewable resources, and with our increasing use and dependence, the blight is becoming more and more serious. The world vigorously advocates sustainable development and environmental protection. Charging piles are the main source of electricity for new energy vehicles, so in order to promote the development of new energy vehicles, matching charging piles have also been put on the agenda.
Charging pile is not we randomly find a place, pull a wire to fix it, in order to build charging pile, first of all to the city's power company to apply, after the power supply bureau on-site investigation, if it is installed in the community, but also need to negotiate with the property, through the property's consent, before construction.
Charging piles have floor and wall mounted, floor type to base, buried wire, electricity, etc., wall mounted generally installed on the wall, then only need to line the wall, it can be safely fixed.
Car charging pile, generally installed in highways, gas stations, underground parking lots, etc., installed in the underground parking lot need to pay attention to is that some underground wet seepage, wire waterproof protection, installation location to ensure that other vehicles can enter and exit normally, but also pay attention to the underground signal is weak, if conditions allow as far as possible installed near the exit.
If the new energy vehicle is only used for walking, or commuting, it is recommended to use slow charging, that is, AC charging pile for charging, and the electricity price is low at night, and does not hinder use during the day.
If the utilization rate is high and used for long-distance use, it is recommended to use fast charging, that is, DC charging pile, DC charging pile charging length, rapid, save time, to meet our long-distance needs, but now the new energy vehicle charging pile is not as popular as the gas station, so we must check the location distribution of the charging pile on the road in advance before departure.